|
Racy Building Strategies - 11 |
|
|
- Before laying Damp proof course (DPC), get the brickwork checked in water level. Keep in mind that top level of the DPC of internal walls is the plinth level of the building. You have already created a burji with plinth level marked on it. Taking its reference, get the levels of internal and external walls checked. Keep in mind that all walls are not at same level and the level of external walls is kept 6 inch below the level of internal walls and also at least 6 inch above the Ground Level.
- For more tips under this part, see Hindustan Times of 29.7.06 or write to us.
|